Cambridge Mosque
The Cambridge Central Mosque cost £23 million to build and is dedicated to the spiritual and social welfare of the city’s estimated six thousand Muslims
View case studyThis was a 2000m2 refurbishment job on a 4x story NHS Hospital that has the largest blood analysis centre in the region. Health and Safety was a major consideration for this site given the constant flow of patient’s staff and visitors, so it was imperative the supply of material ran smoothly without causing any disruption to the vital NHS services in South London.
After the Maguire brothers had successfully completed the installation we arranged to collect the waste material left over on site through the zero waste to landfill service offered. This ensured the site was left with minimal debris to avoid effecting any services that this hospital offers.
“Close liaison and planning with the Client was an important factor in the successful delivery of an excellent project, which finished on time and within budget and is covered by a 25 year guarantee”
The Cambridge Central Mosque cost £23 million to build and is dedicated to the spiritual and social welfare of the city’s estimated six thousand Muslims
View case studyWe were delighted to work alongside single ply services and assist with the design and supply of 1289m2 of Tapered PIR scheme to Bristol Airport
View case studyThe Wardian Towers development provides residents with a serene, natural haven within the heart of London’s business and financial district
View case study